Net Metering State-Wise Rules

Joseph Saviour · 20 Aug 2025

State
Net metering/Net billing/ Behind the meter
NM Max Cap
Transformer criteria
CD criteria
Banking
TOD wise setllement
Carryforward units to next month in annual billing cycle
Challenges in getting OA power
Grid support charges/generation tax/banking charges on solar generation
ED Exemption under the state RE policy
Project Investment
Remarks
Maharashtra
Net Metering
5MW AC
70% of DTC
Max upto 100% CD/SL
Annual
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab (C and D zone).
Yes allowed. Excess units at the end of FY will be settled at APPC rate.
Yes RT and OA simulatneously not allowed. New GEOA regulation clears this hurdle but MSEDCL is still converting onsite projects under gross meter.
Not applicable till cumulative onsite capacity in MH reaches 5GW.
Exempted for first 10 years
CAPEX/OPEX both allowed
NM Capacity is 5MW as per current regulation, however this has been challenged by DISCOMS. Hence, the DISCOMS are currently processing projects with a maximum cap of 999kW
Andhra Pradesh
Both
500kW DC for NM, 1MWp for net billing
80% of DTC x 0.9 pf
Max upto 100% CD/SL
Monthly
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab.
Excess units at the end of monthly billing cycle shall be settled at APPC rate
Not Allowed in case existing project is with net meter.
Currently not applicable as not defined in tariff order. In future GSS may be levied.
Not exempted.
CAPEX/OPEX both allowed
Telangana
Net Metering
1000kWp DC
50% of DTC x0.9 pf
Max upto 100% CD/SL
Monthly (1/2 yearly)
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab.
Excess units (unsettled) shall be settled at APPC rate. This reconcillation shall be done 1/2 yearly once in June and once in December.
Not clearly defined in the policy
Currently not applicable as not defined in tariff order. In future GSS may be levied.
ED is exempted for a period of 10 years from COD
CAPEX/OPEX both allowed
Odisha
Net Metering
No cap
75% of DTC
Max upto 100% CD/SL
Annual
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab.
Yes allowed. Note:Excess units at the end of FY will be lapse.
Not clearly defined in the policy
Currently not applicable as not defined in tariff order. In future GSS may be levied.
ED is applicable (ED is exempted only for CAPEX or Captive projects in which customer has investment in the project)
CAPEX/OPEX both allowed
Tamil Nadu
Net Billing
1MW AC
Max upto 100% CD/SL
Monthly
Same slot adjustment, excess units will be settled at APPC rate
At the end of 12 month, excess units will be settled at APPC rate
Electricity tax shall be exempted for a period of 02 years from COD
CAPEX/OPEX both allowed
UP
Net Billing
2MWp
75% of DTC
Max upto 100% CD/SL
Monthly
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab.
Since there is net billing arrangement in UP, Excess units(Banked) at the end of monthly billing cycle shall be settled at APPC rate
Not clearly defined in the policy
Currently not applicable as not defined in tariff order. In future GSS may be levied.
ED is Exempted for first 10 years from COD
CAPEX/OPEX bolth allowed
Bihar
Net Metering
No cap (In NM regulation no cap is mentioned but in 2017 RE Policy 01MWp cap is mentioned.
80% of DTC
Max upto 100% CD/SL
Annual
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab.
Monthly carryforwad of excess units allowed. Excess/unsettled units at the end of FY will be lapsed.
OA allowed but onsite project’s banking will be lost.
NA
ED is Exempted for first 05 years from COD
CAPEX/OPEX bolth allowed
Haryana
Yes
500kWp
50% of DTC
Max upto 100% CD/SL
Annual
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab.
Monthly carryforwad of excess units allowed. Excess/unsettled units at the end of FY will be lapsed.
NM not allowed for OA consumer
NA
NA
Gujarat
Net Metering
1MW AC
NA
No capacity restriction for projects under Captive mode
Monthly
Excess units can be settled in higher slab but TOD charges will be applicable
Excess units at the end of monthly billing cycle shall be settled at APPC rate. Since the banking is on 15 min interval the sizing should be done on real time consumption.
Net metering and OA simultaneously not allowed.
1.5 Rs/kWh banking charge applicable
Applicable as per state’s ED Act.
Only CAPEX model allowed
Jharkhand
Yes
2MWp
15% of DTC
Max upto 100% CD/SL
Annual
Excess units can be settled in lower slab (off-peak) but can not be settled in higher slab.
Excess units (unsettled) at the end of annual billing cycle (31st March) shall be settled at APPC rate.
Not clearly defined in the policy
NA
ED exempted for first 05 years from COD.
CAPEX/OPEX both allowed
Rajasthan
Both – NM upto 1MW AC and NB for industrial projects
1MW AC for NM No cap for NB
50% of DTC x 0.9 pf
Max upto 100% CD/SL
Annual
Allowed, and excess units settled at the end of FY, but only for domestic projects
NA
Exempted for first 7 years from COD
Kerela
Net metering/ Net billing/ gross metering
1MW AC
75% of DTC
Max upto 100% CD/SL
Monthly
Excess units can be settled in lower slabs (Normal & Off-Peak), but cannot be settled in the higher slab (Peak). normal: 6am to 6pm peak: 6pm to 10pm off-peak: 10pm to 6am
Excess units will be settled annualy at the APPC rate
Not specified
NA
NA
CAPEX/OPEX both allowed
Chhattisgarh
Net metering
500kW
100% of DTC
Max upto 100% CD/SL
Annual
Excess units can only be settled in lower slab not peak slab
Not specified
2% banking charges
NA
CAPEX/OPEX both allowed